跳到技能内容
词映 AI导航
发现工具选型指南Skills 技能AI 快讯AI图片AI视频AI文档AI办公AI助手AI搜索AI编程AI音频AI设计AI智能体模型与开发AI学习模型评测AI提示词内容检测AI金融AI 3D扫描与识别其他工具跨境电商 AI
词映 AI导航
工具库Skills 技能
我的收藏
词映 AI导航
发现工具选型指南Skills 技能AI 快讯AI图片AI视频AI文档AI办公AI助手AI搜索AI编程AI音频AI设计AI智能体模型与开发AI学习模型评测AI提示词内容检测AI金融AI 3D扫描与识别其他工具跨境电商 AI
Skills directory/jeremylongshore/claude-code-plugins-plus-skills/validating-performance-budgets

Performance Budget Validator Skill for JavaScript Size Limits

Define a consistent build size budget and report the assets contributing to a local threshold violation.

中文

Install in Claude Code

Use your frontend build and project budget. The example counts compressed initial JavaScript in KiB.

  1. Get the complete `plugins/performance/performance-budget-validator/skills/validating-performance-budgets` directory from the pinned GitHub commit.
  2. Copy it into the target project's `.claude/skills/`. Check `.claude/skills/validating-performance-budgets/SKILL.md`, start Claude Code at the project root, and call `/validating-performance-budgets`.

Example task

Set 180 KiB for the catalog route. Record an entry of 110 KiB and shared chunk of 85 KiB, then calculate the result.

What to check

The 195 KiB total exceeds the budget by 15 KiB. The report lists both chunks and their measurement basis.

Original SKILL.md on GitHub · Updated 2026-11-13

Frequently asked question

Can a compressed budget be compared directly with an uncompressed total?

Use the same compression and units on both sides, and state whether deferred chunks are included.

Browse Claude Code skills in the Chinese directory
词映 AI 导航Skills 技能
工具分类全部工具已本地化技能选型指南AI 快讯